Course Conditions, Cultural Practices

Be careful what you ask for….

We’ve had two Monday closings and the only aerification that we’ve done is solid tining greens last Monday.  Last Sunday, we received 2 inches of rain and today we’re heading to 4 inches of rain.  We will just try and aerify tees and fairway’s the next two closings.

A 100 percent chance of showers is expected Monday, with possible thunderstorms before 2 p.m. and before 8 p.m., weather officials said. Some of the storms could bring heavy rainfall.

Tuesday through Saturday will have a 70 percent chance of showers. Temperatures throughout the week will fluctuate between the low 80s and low 70s.

I would expect some cart path only conditions over the next few days.

 

Uncategorized

May 9 update

18 rock wall is starting to pick up steam as the bottom course is now almost complete.

I would anticipate the rock wall to be finished by next Wednesday and soil and grading finish in another week.

The staff finished 2 fairway bunker and has started on 4 Fwy bunker as of today. Sod is expected this Tuesday.

Monday was our first closing and we solid tined aerify the greens followed by 2 vertical mowings and topdressing. Greens are putting in the slow side because of these practices and will improve as the week progresses.

4 Fwy bunker nose removal Vertical mowing “verticutting”Verticutting lines2 Fwy bunker awaiting Sod 2 Fwy drainage

Course Conditions, Projects

April showers?

We received 0.47 inches of rain in March and our salts are currently at 2900 TDS. The faucet in our shop has a TDS of 250. Despite the dry, salty and windy conditions the course is playing well. We did lose some impatients and some bougainvilleas lost some leaves because of the salty water. The last two full moons our TDS jumped to 9800 because of the higher river level.

The last two weeks the roughs were lowered from 1.5 inches to 1.0. This is where the Brown has come from.  We were able to renovate the first bunker on hole #3.  We plan on finishing the 2nd fairway bunker after Senior Club Championship the week of April 9th.

img_4639
Rough scalping from 1.5 in to 1.0 in
img_4643
3 Fwy bunker completed last week of March
img_4642
Staff adding sand to #3 Fwy Bunker
img_4700
Wood Duck on his box

Course Conditions

Rakes

When entering bunkers always enter low side of bunkers. John Sanford our course architect designed the bunkers with a bullnose on edge making high points steep. The sod is less than 9 months old and some slopes may not be rooted 100%. This will avoid any trip/fall situations.

Rakes should also be left ½ in ½ out for ease of retrieving.

Our goal for summer 2018 is to renovate fairway bunkers for reduced maintenance and sand/drainage upgrades.

See you on course!

Shane Wright, CGCS

Projects

11 & 15 projects

Today we started on 15 fairway pot bunker. The bunker was eroded and infested with roots. Overtime from wind, rain and golf activity a bunker looses its shape. We are getting the Sod from 11 gold tee area that will be raised and coquina cart path added.

Knocking 2 birds out with one stone…11 Tee improvement with 15 bunker improvement!!! Win Win!

11 Tee rough to be raised and coquina added